01 / LOCAL SUPPLY & INSTALLATION
Split the quotation by responsibility
For a mixed instruction, ask for private flat entrances and communal openings to be identified separately. Send the specification issued by each responsible party. Decide who signs off finishes, who receives installation records and whether appointments must be arranged with individual residents. Do not assume a single approval covers the entire building.
02 / LOCAL SUPPLY & INSTALLATION
Information for your North London installation proposal
A resident replacing an internal door and a managing agent commissioning a communal-door programme need different information. Separate private and shared openings in the enquiry. If responsibility is uncertain, obtain the building contact before agreeing alterations; an occupier who can provide access may not be the person who can authorise the work.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the North London openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
