01 / LOCAL SUPPLY & INSTALLATION
Resolve individual and building-wide requirements
Send the managing agent’s specification with the flat number and existing door details. Highlight any difference between the requested appearance and that specification. Obtain a clear approval route for the proposed arrangement before ordering; installation dates should not be treated as a substitute for unresolved authorisation.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Crouch End installation proposal
For an individual flat entrance, ask whether a building-wide specification or alteration process already exists. Share it before choosing a replacement. A resident’s preferred door can be discussed, but the enquiry should also identify who can authorise changes and receive the work records.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Crouch End openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
