01 / LOCAL SUPPLY & INSTALLATION
Resolve approval and specification questions together
Where a property has an alteration process or project-design requirements, send the relevant information before ordering. Ask who approves substitutions and changes to surrounding finishes. An agreed door specification and permission to carry out the work are separate matters; both need a clear route to resolution.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Westminster installation proposal
Name the particular property and provide its management instructions. The area name does not establish entry arrangements or the door specification. For a larger project, share the current opening schedule and identify the person authorised to resolve differences between the brief and conditions found on site.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Westminster openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
