01 / LOCAL SUPPLY & INSTALLATION
Confirm delivery and working restrictions
Ask the building contact about unloading, material movements, lift bookings and permitted working periods. Mark these as constraints in the installation brief. Product requirements and an achievable programme need to be discussed together; a preferred date cannot be confirmed from the area name or door quantity alone.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Canary Wharf installation proposal
For managed premises, give the building name, floor, tenancy and route used by contractors. Include reception or delivery requirements already issued. A general postal address may not identify which doors are included or who can authorise work within a particular occupier’s space.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Canary Wharf openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
