01 / LOCAL SUPPLY & INSTALLATION
Keep the approved specification with the order
For a flat entrance supplied as part of a programme, identify the current revision of the specification and who approved it. Clarify how any proposed product change will be reviewed. The installation record should refer to the actual door and agreed work, rather than only to a general building-wide purchase order.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Bethnal Green installation proposal
A resident may be responding to a letter while building management is coordinating several doors. Explain which applies and send the instruction. This helps avoid an isolated choice based on appearance when the building has already set a specification or approval process for the work.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Bethnal Green openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
