01 / LOCAL SUPPLY & INSTALLATION
Separate landlord and tenant handover records
Where installation spans common parts and an occupier’s premises, agree who receives the documents for each door. Keep the opening references and scope visible on the schedule. This prevents a general project handover from leaving the tenant or building manager without the information relevant to their own responsibilities.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Bank installation proposal
For premises around Bank, give the building name, entrance, floor and tenancy. A landmark helps locate the general area but not an opening inside a multi-occupier property. Connect each request to the actual door and the contact who can provide entry.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Bank openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
