01 / LOCAL SUPPLY & INSTALLATION
Agree the visual schedule without losing technical detail
Provide the approved colour, panel pattern and hardware preferences alongside the door requirements. Identify who signs off the proposed arrangement. If the replacement must coordinate with other entrances, resolve that before ordering while keeping compatibility and supporting evidence central to the product decision.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Pimlico installation proposal
For one flat entrance, establish whether the building has a wider set of findings or an agreed appearance. Share these instructions with the required performance information. Choosing a visually matching door alone does not resolve ownership, management approval or the specification for the complete opening.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Pimlico openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
