01 / LOCAL SUPPLY & INSTALLATION
Clarify complete doorset versus retained frame
If you are comparing a new doorset with a leaf replacement proposal, ask what evidence supports each arrangement and what assessment of the existing opening is required. The quotation should explain its scope and limitations. Choosing solely by the visible door style can miss a material difference between proposals.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Peckham installation proposal
Send the managing agent’s specification or the relevant inspection extract, and identify your flat entrance. A single damaged component does not establish that only that component needs replacing. Discuss the proposed door, frame and hardware together, with any assumptions about retained elements made explicit.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Peckham openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
