01 / LOCAL SUPPLY & INSTALLATION
Resolve management approval before ordering
Send the property instructions, current door details and any proposed appearance changes together. Ask who confirms the selected arrangement and whether additional evidence is required before work proceeds. Do not assume that matching an existing door visually satisfies either the project specification or the management approval process.
02 / LOCAL SUPPLY & INSTALLATION
Information for your Barbican installation proposal
For a managed residential property, request the relevant door and alteration requirements before proposing changes. Appearance, hardware and approval processes must come from the actual property information. The development name alone does not establish a specification or authorise an individual replacement.
03 / LOCAL SUPPLY & INSTALLATION
What happens before an order?
For the Barbican openings included in your instruction, agree the specification, assessment required, access arrangements and proposed documentation before ordering. We provide supply and installation together. If information is missing, highlight it in the enquiry so that provisional assumptions can be resolved before products and dates are confirmed.
